DETAIL KOLEKSI

Rancanganan sistem pengendalian persediaan menggunakan metode economic production quantity dengan model partial backordering pada PT. Kaloka Binangun


Oleh : Ilham Akbar Fajrin

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2014

Pembimbing 1 : Parwadi Moengin

Pembimbing 2 : Sucipto Adisuwiryo

Subyek : Manufacturing company;Steel industry;Inventory control

Kata Kunci : simulation, fabrication target, operator utility

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2014_TA_STI_06310138_Halaman-Judul.pdf
2. 2014_TA_STI_06310138_Lembar-Pengesahan.pdf
3. 2014_TA_STI_06310138_Bab-1_Pendahuluan.pdf
4. 2014_TA_STI_06310138_Bab-2_Tinjauan-Pustaka.pdf
5. 2014_TA_STI_06310138_Bab-3_Metodologi-Penelitian.pdf
6. 2014_TA_STI_06310138_Bab-4_Pengumpulan-dan-Pengolahan-Data.pdf 49
7. 2014_TA_STI_06310138_Bab-5_Simulasi-dan-Analisis-Hasil.pdf
8. 2014_TA_STI_06310138_Bab-6_Keismpulan-dan-Saran.pdf
9. 2014_TA_STI_06310138_Daftar-Pustaka.pdf
10. 2014_TA_STI_06310138_Lampiran.pdf

F For the DVTV group, 5 model proposals were proposed. According to the increase of output production result and the increase of utility percentage, and the cost that was spent, the best chosen model proposal is the model proposal V, which is by changing the raw materials arrival frequency every 2 days and moving 2 operators from longitudinal flatness area to Full Welding area. Theproduced utility is 35,65% and the cost is Rp. 34.530.600,00.For the Trailer group, 3 model proposals were proposed. According to the increase of output production result and the increase of utility percentage, and the cost that was spent, the best chosen model proposal is the model proposal II, which is by adding 1 work shift and changing the raw materials arrival frequency every 1 day. The produced utility is 43,77% and the cost is Rp. 97.900.0000.

P PT. United Tractors Pandu Engineering is one of the subsidiaries of PT. Astra International Inc. that focused in heavy equipment.The problem that occurs in floor plant 2 production is the difficulties of achieving the fabrication target on time for the DVTV group and trailer group product. The fabrication target for DVTV group is 88 units, and the fabrication target for trailer group is 25 units. However, the current average fabrications for DVTV group and trailer group are 79 and 19 units. The research process begins by collecting the data of the company such as general company data, manufacture data, and production data. After it was done, next step is making a conceptual model. Then a simulation model is built using ProModel 6.0 software. From the result of simulation, the deficiency of the system that causes unachieved production target will be analyzed. A scenario will then be made to solve the problem.

Bagaimana Anda menilai Koleksi ini ?